Alexandra Hospital Electrical Power Distribution Upgrade
September 19, 2024

This project was a new, $8.8 million, two storey school. It is one of the largest elementary schools in the Lambton-Kent District School Board. Sustainable design features include a high efficiency boiler plant and a Dedicated Outside Air System (DOAS) which provides ventilation for the school and includes an energy recovery wheel. Air-distribution systems were designed to achieve optimal ventilation efficiency and demand-based ventilation control systems were provided for areas with highly variable occupancy.

Value:

$8.8 million

Size:

4,500 m2

Location:

Sarnia, ON

Client:

J.P. Thomson Architects

Year Completed:

2010

Awards:

LEED Silver